Challenge
Europe faced a critical shortage of natural gas, and the existing terminal was operating at maximum capacity. Delays in permitting and global supply chain bottlenecks threatened to leave the region vulnerable to supply cuts during the heating season, creating a geopolitical emergency.
Solution
We leveraged our global supplier network to fast-track the delivery of additional regasification modules, bypassing standard lead times. We utilized a phased construction approach that kept the existing terminal fully operational while expanding, ensuring no supply interruption. Our regulatory team worked directly with EU officials to expedite environmental approvals without compromising safety standards, delivering the doubled capacity just weeks before the winter peak.